Skip to main content

This project consisted of the relocation of approximately 4500 feet of water main in various sizes. Other project components include:

  • Directional Boring of 450′ of 10″ ductile iron water main
  • Pavement Reconstruction
  • Concrete Restoration
  • Grass Restoration
  • Numerous Shut-Down Connections
  • Detailed Traffic Control Operations

References:

Kane County Division of Transportation (www.kdot.kanecountyil.gov) @ 630-584-1170.